Skip to content
Precision CNC · Long Beach, CA · Est. 2014

Tight-tolerance parts. Same-day quotes. Engineer-to-engineer speed.

5-axis CNC machining down to ±0.0005", in as little as 3 business days. Median quote turnaround under 6 hours on files under 50 parts — verified across 18,400+ RFQs last year. No SDR funnel, no black-box algorithm — a named senior machinist signs off on every quote.

  • AS9100D
  • ISO 9001:2015
  • ITAR
  • NADCAP
§ 01 · 2024 SHIPPED ORDERS

What a 2024 order at GazBming actually looked like, in numbers.

99.4% on-time shipment rate across 41,200+ parts shipped in 2024
97.6% first-article acceptance rate, last full audit cycle
5.8hrs median quote turnaround on RFQs under 50 parts
±0.0005" tightest tolerance routinely held on 5-axis work
§ 02 · THE QUOTE DESK

From file upload to signed quote in six hours.

Every RFQ moves through the same four checkpoints. No ticket is closed by automation alone — a named human owns it end to end.

  1. 01

    Upload + ingest

    Drop STEP, IGES, X_T, or native SolidWorks / Fusion / Onshape files. Auto-checks for tessellation, units, and missing PMI. Engineer gets a confirmation in < 5 min.

    Desk: Intake · M. Alvarez
  2. 02

    Live DFM review

    GD&T, wall stock, undercuts, and tolerance stack-ups are flagged inside the quote — not after. You see the redline before you ever see the price.

    Desk: DFM · S. Khoury, Sr. Programmer
  3. 03

    Programmer pricing

    Cycle time pulled from our Hermle C42U and DMU 50 cell logs, not from a generic estimator. Material sourced from our 14,000 sq ft climate-controlled stock.

    Desk: Programming · 11 senior CNC programmers
  4. 04

    Machinist sign-off

    Quote is reviewed and signed by a named machinist before it leaves the shop. Same human runs the job when the PO lands. No re-handoff, no drift.

    Desk: Final review · Lead machinist on shift
§ 03 · CAPABILITY SHEET

Capability sheet. No marketing adjectives.

What we run, what we hold, and what we keep on the floor. If a number isn't on this page, ask — we'll either show you the CMM report or admit we don't do it.

01

Machines on the floor

  • Hermle C42U5-axis, daily lights-out since 2017
  • DMU 505-axis, second cell, titanium-rated
  • Haas VF-2SS ×4high-speed 3-axis supersport
  • Mazak QT-200lathe, live tooling
  • CMM — Hexagon Global Sin-process inspection
02

Tolerance bands we hold

ClassTol.Median lead
Standard±0.005"4.2 days
Tight±0.001"5.6 days
Precision±0.0005"6.8 days
Ultra±0.0002"DFM review
03

Stock material on hand

  • 6061-T6bar + plate
  • 7075-T6bar + plate
  • 303 / 304 SSround + sheet
  • C360 brassround stock
  • Ti-6Al-4Vcall for avail.
  • PEEK / Delrinrod + plate
04

Certifications & posture

  • AS9100Daerospace QMS
  • ISO 9001:2015general QMS
  • ITAR registereddefense + aerospace parts
  • NADCAPheat treat + NDT
  • DFARS-compliantmaterial sourcing on request
5-axis machined robotics actuator housing on CMM granite
ROBOTICS · 5-AXIS ACTUATOR HOUSING · ±0.0005" — REV. D, ACCEPTED FIRST ARTICLE
§ 04 · WHO SENDS US DRAWINGS

Who sends us drawings, and what we make for them.

Founded by two former SpaceX and Tesla mechanical engineers, so it's no accident the bench leans hard into robotics, aerospace, and defense. But the cell runs the same on medical and drone work.

  • Aerospace

    Flight-qualified brackets, sensor mounts, and structural test articles. Full FAI, AS9100D paperwork, NADCAP heat-treat when the print calls for it.

  • Robotics & actuators

    Harmonic-drive housings, gearbox carriers, end-effector jaws. We hold ±0.0005" on the bearing journals and ship to your integration schedule, not someone else's queue.

  • Medical devices

    Benchtop instrumentation, surgical-tooling prototypes, sterilization-tolerant alloys. Production in a Class 8 equivalent area; biocompatibility material certs on file.

  • Defense & drones

    ITAR-registered workflow, cage code on the PO. Airframe sub-assemblies, gimbal frames, payload enclosures — flight articles shipped with full material traceability.

See industries we serve →
§ 05 · THE RECEIPTS

Eleven years, two shops, 3,100+ customers. The receipts.

11 years on the floor since the 2014 founding in Long Beach
38,000 sq ft of climate-controlled shop across Long Beach + Phoenix
3,100+ unique customers shipped to in 2024, across 22 countries
38 days average customer reorder time — vs. 94-day industry benchmark
PRESS Inc. 5000 — 2023, 2024 ASME Mechanical Engineering — ‘Shops to Watch’ Q2 2024 Modern Machine Shop — feature, Nov 2023